BARKLY SQUARE SHOPPING CENTRE

A high level of coordination was required with Citipower and Yarra trams for shutdowns to enable the erection and dismantling of the façade scaffolding around a busy shopping mall entry.

Installation of structural steel to an existing double frontage façade to provide support to the leaning façade. Works also included full tenancy demolition de-fit, office fit out, and façade restoration which including matching render works and painting.